弯通一错,线缆全磨破
山东工地放电缆那天,非常怕听到“这弯过不去”。桥架主体板厚、锌层都达标,偏偏弯通角度、半径、接口没配好,电缆硬拽过去,外皮蹭出白痕,验收时绝缘一摇就报警。桥架这东西,直段谁都会做,弯头、三通、变径这些“连接件”才是暗账。
On the day when the cable was laid on the construction site in Shandong, I was most afraid of hearing 'this bend cannot be passed'. The thickness and zinc layer of the main body of the bridge meet the standards, but the bending angle, radius, and interface are not properly matched. The cable is forcefully pulled over, and white marks are scraped on the outer skin. When the insulation is shaken during acceptance, an alarm is triggered. Anyone can make the straight section of a bridge, but the "connectors" such as bends, tees, and reducers are the hidden accounts.

先说弯曲半径。电缆允许非常小弯曲半径一般是外径的 6–10 倍(铠装、单芯高压更大)。桥架弯通的内半径建议大于这个数,否则线缆在拐角处被顶死,穿线工一拉就破皮。采购单只写“水平弯通 200×100”,不写 R 值,到货现场拿卷尺一量 R=150,单芯 95² 根本转不过来。
Let's talk about the bending radius first. The minimum allowable bending radius for cables is generally 6-10 times the outer diameter (larger for armored and single core high voltage). The inner radius of the cable tray must be greater than this number, otherwise the cable will be stuck at the corner and the threading worker will break the skin when pulling it. The purchase order only states "horizontal bend 200 × 100" without R value. When it arrives at the site, take a tape measure and measure R=150, and the single core 95 ² cannot be rotated at all.
再看弯通形式。水平弯、垂直上下弯、水平过梁弯(S 弯)、内外阳角,每种受力不一样。过梁弯两段转角挨太近,中间那段短直段小于电缆外径 3 倍,线缆在里头别着劲;垂直下弯没做“滴水弯”,雨水顺桥架流进配电箱。山东这边地下室、车库管线密,S 弯用得非常多,两段夹角非常好各 ≤30°,别拿两个 45° 硬拼。
Let's take another look at the bending form. Horizontal bending, vertical up and down bending, horizontal beam crossing bending (S-bending), internal and external external angles, each with different forces. The two corners of the beam are too close, and the short straight section in the middle is less than three times the outer diameter of the cable, causing the cable to be stuck inside; There is no 'drip bend' in the vertical downward bend, and rainwater flows into the distribution box through the bridge. The underground and garage pipelines in Shandong are dense, and S-bends are most commonly used. The angle between the two sections should preferably be ≤ 30 ° each, and do not use two 45 ° hard splices.
第三是接口处理。弯通和直段对接,连接片+螺栓建议跨接地线(镀锌编织带或 4mm² 软铜线),不然接地电阻测不过。接口缝隙>1mm 就打磨,毛刺朝外翻,电缆拖过去就是一刀。防火区段的弯通还要在接口内侧加防火隔板,别只靠外面堵泥。
The third is interface processing. Bent and straight sections must be connected, and the connecting piece and bolt must cross the grounding wire (galvanized braided tape or 4mm ² soft copper wire), otherwise the grounding resistance cannot be measured. If the interface gap is greater than 1mm, polish it. If the burrs turn outward, dragging the cable will result in a sharp cut. The bending of the fireproof section should also be equipped with fireproof partitions on the inside of the interface, instead of just relying on the outside to block the mud.
第四是变径和三通。主干 400×100 分到 200×100,变径段长度至少 5 倍高度差,斜边缓一点,线缆不叠压。三通开口方向对着盖板侧,别朝底板——朝下开口积灰积水,朝上开口盖板扣不严。
The fourth is variable diameter and three-way. The main trunk is divided into 400 × 100 to 200 × 100, with a variable diameter section length of at least 5 times the height difference, a slightly gentle sloping edge, and no overlapping of cables. The direction of the three-way opening should face the side of the cover plate, not towards the bottom plate - the downward opening accumulates dust and water, and the upward opening of the cover plate is not tightly fastened.
还有个隐账:热胀冷缩。山东四季温差大,长直段桥架夏天顶、冬天拉,弯通处非常容易被顶变形。直线段超 30 米要加伸缩节,弯通两侧留 20–30mm 活动余量,螺栓孔做长圆孔,别全焊死。
There is also a hidden account: thermal expansion and contraction. Shandong has a large temperature difference throughout the four seasons, and the long straight section of the bridge is most prone to deformation at the top in summer and the bend in winter. Expansion joints should be added for straight sections exceeding 30 meters, with a 20-30mm allowance on both sides of the bend. Bolt holes should be made with elongated circular holes and not fully welded.
桥架装得直不算本事,弯通配得顺才算完。半径够、形式对、接口跨接、变径放缓、伸缩留量——这五样咬住,山东这边的电缆才真能“穿得进去、不磨皮、验收一次过”。
The straight installation of the bridge does not count as a skill, only when the bends are smoothly matched can it be considered complete. With sufficient radius, appropriate form, interface crossover, reduced diameter, and sufficient expansion and contraction allowance - these five factors are essential for the cables in Shandong to truly "fit in, not wear the skin, and pass the inspection once".
本文由山东电缆桥架友情奉献。更多有关的知识请点击:http://www.sdhangfeng.com 我们将会对你提出的疑问进行详细的解答,欢迎你登录网站留言.
This article is a friendly contribution from Shandong Cable Bridge. For more information, please click: http://www.sdhangfeng.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message