电缆桥架安装的现场要求
电缆桥架安装的现场要求:
Installation of cable bridge:
1、土建工程应全部结束且预留孔洞,预埋件符合设计要求,预埋件安装 牢固,强度合格。
1, the civil works shall be completed and the holes shall be reserved, and the embedded parts shall conform to the design requirements, the installation of the embedded parts shall be strong and the strength will be qualified.
2、桥架架设沿线模板等设施拆除完毕,场地清理干净,道路畅通。
2, the bridge is set up along the line of the road and the other facilities have been dismantled, the site is cleared and the roads are cleared.
3、室内电缆桥架的安装宜在管道及空调工程施工基本完毕后进行。如需交叉作业,既要做好电气工程的成品保护,又要执行其他分项工程成品保护揩施。
The installation of indoor cable bridge is suitable for the construction of pipe and air conditioning. If it is necessary to cross the work, it is necessary to do the protection of the finished product of electrical engineering, and to perform the protection of the other parts of the project.
如有需要,欢迎新老客户前来选购!我们本着质优价廉的宗旨来为您提供产品和服务。真诚期待与您合作!
If need, welcome new and old customers to come and choose! We offer products and services to you in the spirit of quality and low price. Sincerely looking forward to cooperating with you!
上一篇:镀锌电缆桥架的惯用耐腐蚀方法
下一篇:热镀锌桥架和镀锌桥架制作工艺上的区别
下一篇:热镀锌桥架和镀锌桥架制作工艺上的区别
相关文章 / Recommended news
- 济南厂房福音!大跨距桥架破解3大痛点,加强筋加,安装省一半钱
- 山东工程人警惕!桥架敷线踩这坑必返工,监理当场叫停,国标早有明确规定
- 济南人避坑!桥架≠线槽,90%工程人都搞混,一字之差差千里
- 避坑指南!山东电缆桥架规格别瞎选,偏大浪费偏小隐患大,国标早就定好了
- 济南人必看!铝合金电缆桥架选对厚度,耐用又省心,90%的人选错踩坑
- 山东人必看!电缆桥架不是“铁架子”,藏着建筑用电的密码,90%的人都不懂
- 800kg/m抗压!济南电缆桥架,破解3大工程痛点,工期省30%
- 3种类型+98%散热!山东电缆桥架,选对不踩坑,布线效率翻倍
- 2类核心支架!济南电缆桥架,抗震承重双达标
- 别再混淆!山东电缆桥架vs线槽,6大核心区别一文分清
阳极氧化铝合金桥架
托盘式电缆桥架
梯式电缆桥架
梯式不锈钢电缆桥架
深灰色金属防火电缆桥架


